Comparing Video Production Quotes in Hong Kong: Filming, Editing and Versions + Free Budget Template

Compare video production quotes in Hong Kong by the work included, rather than finished minutes alone. Two films of the same length may require different filming days, locations, interviewees, sound, captions and horizontal or vertical versions. Put quotations into one delivery list before interpreting the price difference.
Every amount and schedule below is an Allua hypothetical planning example, not a market survey, current package or commitment to quote a project at that price. Confirm actual scope, dates, locations and usage before commissioning.
Start with a brief a supplier can price
Consider a fictional two-minute service introduction: one indoor Hong Kong location, one filming day and two interviewees, plus two 30-second edits, 16:9 and 9:16 outputs, and Traditional Chinese and English captions. Even this practice brief must specify working hours, cameras, sound, caption combinations and the final file count.
Separate planning, preparation, filming, post-production and versions. Identify the information, products, speakers and location the brand supplies. Clarify talent, makeup, travel, sets, music and narration. “Filming and editing included” is not a complete scope.
Five budget areas to compare
Planning area | Hypothetical HK$ range | Scope and limitations |
Planning and preparation | 4,000–8,000 | Brief, interview outline, script and shoot arrangements |
Filming | 10,000–18,000 | One indoor day in this example; confirm crew, equipment and hours |
Main-film post-production | 8,000–16,000 | Editing, basic sound/picture work and agreed revisions |
Edits and output versions | 2,000–6,000 | Short edits, reframing, captions and the delivery matrix |
Assets and usage | 0–5,000 | Only for this example; licensing, voice or special needs may exceed it |
These are not market minimum or maximum rates. Adding the assumed ranges gives HK$24,000–53,000 before unlisted requirements or a contingency. Mark an item as included when a package already covers it, rather than charging it twice. Keep paid media spending separate from production.
A worked HK$37,400 planning example
Assume HK$6,000 for preparation, HK$12,000 for filming, HK$10,000 for the main edit, HK$4,000 for versions and HK$2,000 for asset usage. The subtotal is HK$34,000. A brand-held 10% contingency adds HK$3,400 for a HK$37,400 planning total. It is a management reserve, not a supplier quotation or permission to spend without approval.
For an extra half-day, changed interviewee or rewritten script, request a change order recording the reason, additional work, cost, affected dates and approver. A contingency should not hide essential items that were never aligned.
Free video quotation and version budget Word template
The bilingual editable pack includes a brief, five budget areas, the HK$37,400 calculation, a normalized A/B quote comparison, a version matrix, a change order and acceptance checks. Enter your email, select a usage purpose and accept the subscription consent shown at the entry form to receive both Word links.
Normalize two quotes to the same requirement
Comparison | Fictional quote A | Fictional quote B |
Initial quotation | HK$34,000 | HK$29,000 |
Required captions and short edits | Included | Add HK$5,000 |
Required asset usage | Included | Add HK$3,000 |
Like-for-like subtotal | HK$34,000 | HK$37,000 |
Still to confirm | Revision rounds, hours and payment | Revision rounds, hours and payment |
This is a fictional comparison, not real supplier pricing. Add only work the project needs that is missing from the initial offer. Extras do not establish that supplier B is worse; ask for a final aligned total, then compare quality, responsibilities and delivery.
Specify versions as a matrix
List duration, ratio, caption language, clean version, cover and filename row by row. Two edits multiplied by two ratios and two caption languages can create eight combinations, but count only the combinations actually agreed. Different platform names do not automatically mean separate edits.
A 9:16 output may require more than cropping the sides: people, captions, safe areas and charts may need reframing. Distinguish a new edit, layout adjustment, caption replacement and simple file conversion, with the included revisions for each.
Review schedule and acceptance with the price
Two to four weeks can be an internal scheduling discussion example for this simple fictional project: preparation and script, one shoot day, rough cut, consolidated feedback, revisions and exports. It is not a standard lead time. Speaker and location availability, assets, approvals and complexity determine the real schedule.
Acceptance should check facts, captions, sound and picture, brand elements, the output matrix, usage, deliverable source files and retention. Viewing, enquiries and revenue also depend on audience, distribution and purchasing processes; completed delivery is not evidence of commercial performance.
Frequently asked questions
Is a per-minute comparison fair?
Not always. Shots, crew, locations, sound, animation and versions define the work. Align the brief and deliverables before comparing totals.
Does a filming day include all time?
Specify how hours are counted, setup and pack-down, travel, breaks, overtime, rescheduling and weather arrangements. Resolve omissions before confirming.
Do two revision rounds include unlimited reshoots?
No. Define how feedback is consolidated, which editing corrections are included and which reshoots or script changes are extra. Approve additional scope through a change order.
What should be confirmed before paying a deposit?
Confirm the brief version, itemized scope, delivery matrix, dates, rights, payment stages, cancellation and variation terms, and the final approver.
Ask Allua to turn your requirements into a comparable scope
Share the purpose, audience, locations, people, references, existing assets, language and version requirements, budget and deadline. Allua can suggest filming and post-production scope for a quotation based on the actual project.
Third-party information changes; check before use. Example amounts are for planning only. Actual scope, timing and pricing depend on quotation. Please contact Allua with corrections.




Comments